BESS · EquisEquis Energy (Australia) Projects (Ngumi 4) Pty Ltd · Storage - Battery
13 Jun 2026 09:05 → 14 Jun 2026 09:05 AEST
| Capex total (greenfield) |
$546.41M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$2,732,068
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Project-specific capital investment value of $518 million found in NSW Department of Planning assessment report for the Calala Battery Energy Storage System (SSD-52786213). The report describes a 300 MW / 600 MWh project; Equis later announced a 250 MW / 500 MWh Calala BESS reaching financial close in March 2025. Because the user requested CABESS1 and the project appears to have been resized, capex per MW and per MWh are calculated using the 300 MW / 600 MWh planning value to match the NEM site reference, but this should be reviewed against the registered DUID capacity once available. O&M and performance defaults were not plant-specific in the sources searched, so no plant-specific O&M assumptions were populated.