Hydro · Hydro-Electric Corporation · Hydro - Dam
Dispatch target (cleared) vs availability — 5‑minute intervals. TAS1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9269 |
| 2025-07-01 | 0.9396 |
| Capex total (greenfield) |
$9.28M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$760,877
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh default |
$1.00
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield construction cost or refurbishment cost for Butlers Gorge was located in the searched official/public sources. Hydro Tasmania’s fact sheet confirms the station was commissioned in 1951 and has 12.2 MW capacity; the EPBC referral confirms Butlers Gorge is part of the Tarraleah scheme and that the scheme is ageing and in need of significant investment, but does not give a plant-specific capex figure for Butlers Gorge. O&M and asset-life assumptions were not sourced and are left null rather than inferred from generic benchmarks because no explicit benchmark search result was successfully retrieved in the provided results.