16 Jun 2026 20:35 → 17 Jun 2026 20:35 AEST
| Capex total (greenfield) |
$84.39M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,482,005
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$4.97M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$248,477
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh default |
$1.00
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
Burrinjuck is an existing hydro dam station commissioned in 1938. No credible owner/developer announcement for original greenfield plant capex was found in the search results, so capex is left blank rather than inferred from benchmarks. The station has undergone upgrades/refurbishments, but no specific refurbishment cost for BURRIN was verified here.