Burdekin BESS

BESS · BURDEKIN SOLAR FARM PTY LTD ATF BURDEKIN GENESIS PROJECT TRUST · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
500/2,000 MW
Researched capacity / storage
Est. SRMC
$1.58/MWh
Key information
Capacity (AI)
500 MW / 2,000 MWh

AEMO spreadsheet (provided in prompt): 500.40 MW / 2000.00 MWh for Burdekin BESS.

AEMO status Publicly Announced
Project status Development (AI)

AEMO spreadsheet lists the site as 'Publicly Announced', which is a pre-construction stage; no primary-source build/commissioning evidence was provided in the supplied materials.

Coordinates

DUID
Owner BURDEKIN SOLAR FARM PTY LTD ATF BURDEKIN GENESIS PROJECT TRUST
Commissioned Sep 2026
Expected closure 2056
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Equipment confidence low
Stats window
13 Jun 2026 02:20 → 14 Jun 2026 02:20 AEST

Dispatch & revenue

13 Jun 2026 02:20 → 14 Jun 2026 02:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
500 MW / 2,000 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.58/MWh
Capex total (greenfield)
$738.40M

Shown in table
$738.40M (2026 real AUD)

Reported / source value
$700.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MWh storage derived
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$32.17M

Shown in table
$32.17M (2026 real AUD)

Reported / source value
$30.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Annual fixed O&M is calculated by applying the midpoint of the AEMO/Aurecon indicative range to the stated 500.4 MW capacity.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 05 Jun 2026

Fixed OPEX / MW-yr
$64,294

Shown in table
$64.3k (2026 real AUD)

Reported / source value
$61.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as the basis for fixed O&M; midpoint applied because the report provides a range rather than a single value.

Reference
2024 Energy Technology Cost and Parameters Review (high confidence)
Source recorded 05 Jun 2026

Variable OPEX / MWh
$1.58

Shown in table
$1.58 (2026 real AUD)

Reported / source value
$1.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The review does not provide a variable O&M figure, so the supplied fallback was kept.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 05 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No project-specific greenfield investment cost for Burdekin BESS was found in the searched owner/developer/government sources, so capex remains unfilled rather than using a benchmark as a reported figure. AEMO/Aurecon 2024 review indicates utility-scale BESS projects are trending to 25-year operational life and gives indicative annual fixed O&M of AUD 51,000-79,000 per MW (net); midpoint used here implies AUD 30.5 million annually for 500.4 MW. Variable O&M was not specified in the AEMO review; the server-side fallback of AUD 1.50/MWh was retained. Capex should be revisited if an owner or financing announcement discloses the project total investment.

Sources