BESS · Bungama Project (Solar) Operations Pty Ltd · Storage - Battery
13 Jun 2026 00:00 → 13 Jun 2026 23:05 AEST
| Capex total (greenfield) |
$114.63M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$382,096
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$4.09M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$27,293
Shown in table Reported / source value |
| Variable OPEX / MWh |
$1.64
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
Plant-specific project cost for Bungama Solar / Bungama BESS Stage 1 was not publicly stated in the sources found. Official project pages confirm a 150 MW / 300 MWh first stage and financial close/construction timing, but do not disclose a total capital cost. Using server-side fallback only for O&M inputs as instructed. Project life on the Revera site is described as up to 25 years. The source material also references a larger hybrid Bungama project and a separate 250 MW / 500 MWh or 250 MW / 700 MWh BESS framing on some pages, so the public materials are not fully consistent with the 150 MW / 300 MWh NEM unit.