Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
15 May 2026 09:20 → 14 Jun 2026 09:20 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-04 | 0.8284 |
| 2025-07-01 | 0.9484 |
| Capex total (greenfield) |
$45.00M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$900,000
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Project is the AGL Broken Hill grid-forming battery (50 MW / 50 MWh). I used the owner-reported actual project capex of A$45m from AGL's FY25 half-year results (published 2026-02-11). AGL/ARENA earlier reported total project cost of A$39.4m / A$39.4m; because the latest owner-reported actual construction cost is higher, capex_total_aud is set to A$45m. No project-specific O&M or fuel cost disclosures were found in the searched sources, so those fields are left null. Battery storage has no fuel cost and zero direct emissions in operation.