Broken Hill (BHB1)

BESS · MACQGEN · Storage - Battery

Operational AEMO: In Service NSW1 Other - Other NEM data · 24 hours
50/50 MW
Registered nameplate capacity / storage
24 hours revenue
$1.4k
Capacity factor
1.6%
Revenue / MWh
$68.48
Est. SRMC
$1.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
50 MW / 50 MWh

AEMO status In Service
Project status Operational (AI)

GPA Engineering 2024 / AGL project summary: Broken Hill BESS became operational in August 2024; AGL commissioned 2024-06-01.

Region NSW1
Coordinates -31.95600, 141.46700 (AI)

Broken Hill town coordinates used as proxy; precise plant coordinates not found in provided sources (LatLong.net / DistancesFrom).

MLF 0.9484
DUID BHB1
Owner MACQGEN
Commissioned Jun 2024
Expected closure 2043
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Fluence
Battery platform / chemistry lithium-ion battery (grid-forming BESS)
Inverter OEM Fluence
Inverter / PCS model grid-forming PCS / inverter (model not documented)
Equipment confidence medium
Stats window
12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST

Dispatch & revenue

12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST

Energy revenue (× MLF)
$1.4k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
19.7 MWh
Available
195.0 MWh
Curtailed
195.7 MWh
Curtailment
100.3%
of available
MLF used
0.9484
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-04 0.8284
2025-07-01 0.9484

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
50 MW / 50 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
$45.00M

Shown in table
$45.00M (2026 real AUD)

Reported / source value
$45.00M (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Independent agency disclosure of total project cost; lower than later owner-reported actual cost.

Reference
AGL Broken Hill Grid-Forming Battery (medium confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MWh storage derived
$900,000

Shown in table
$900.0k (2026 real AUD)

Reported / source value
$900.0k (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived from total capex and energy capacity, since battery duration is 1 hour.

Reference
AGL Broken Hill Grid-Forming Battery (high confidence)
Source recorded 05 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026

Notes
Project is the AGL Broken Hill grid-forming battery (50 MW / 50 MWh). I used the owner-reported actual project capex of A$45m from AGL's FY25 half-year results (published 2026-02-11). AGL/ARENA earlier reported total project cost of A$39.4m / A$39.4m; because the latest owner-reported actual construction cost is higher, capex_total_aud is set to A$45m. No project-specific O&M or fuel cost disclosures were found in the searched sources, so those fields are left null. Battery storage has no fuel cost and zero direct emissions in operation.