BESS · Genex Power Limited · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
02 Aug 2026 00:00 → 02 Aug 2026 22:25 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
Stored energy at the start of each 5‑minute interval (AEMO INITIAL_ENERGY_STORAGE).
Available up to the latest next‑day dispatch file.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.| Effective from | MLF |
|---|---|
| 2024-10-04 | 0.9528 |
| 2025-07-01 | 0.9358 |
| 2026-07-01 | 0.9008 |
| Capex total (greenfield) |
$65.50M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$655,022
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$1.36M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$27,293
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.64
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Greenfield capex based on Genex-reported total capital spending budget of $60 million including finance costs and contingency funds for the 50MW/100MWh project. Fixed OPEX uses the provided server-side default for battery storage; variable OPEX uses the provided default. Project was fully operational from 2H CY2023.