Bouldercombe Battery project (BBATTERY1)

BESS · Genex Power Limited · Storage - Battery

Operational AEMO: In Service QLD1 Other - Other NEM data · 24 hours
50/100 MW
Registered nameplate capacity / storage
24 hours revenue
$3.6k
Capacity factor
1.7%
Revenue / MWh
$170.15
Est. SRMC
$1.64/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
50 MW / 100 MWh

AEMO status In Service
Project status Operational (AI)

Genex Power project page / company about page (2024) says Bouldercombe Battery Project has been operating since Nov 2023.

Region QLD1
Coordinates -23.32700, 150.57500 (AI)

Powerlink project page says the battery is next to Bouldercombe Substation near Rockhampton; approximate site location inferred from project references.

MLF 0.9358
DUID BBATTERY1
Owner Genex Power Limited
Commissioned Nov 2023
Expected closure 2042
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Tesla
Battery platform / chemistry Megapack
Inverter OEM Tesla
Inverter / PCS model Megapack inverter/PCS
Equipment confidence high
Stats window
12 Jun 2026 13:10 → 13 Jun 2026 13:10 AEST

Dispatch & revenue

12 Jun 2026 13:10 → 13 Jun 2026 13:10 AEST

Energy revenue (× MLF)
$3.6k
FCAS revenue (× MLF)
$479
FCAS volume
758.1 MWh
Dispatched
20.9 MWh
Available
396.6 MWh
Curtailed
375.9 MWh
Curtailment
94.8%
of available
MLF used
0.9358
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-10-04 0.9528
2025-07-01 0.9358

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
50 MW / 100 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.64/MWh
Capex total (greenfield)
$65.50M

Shown in table
$65.50M (2026 real AUD)

Reported / source value
$60.00M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Genex stated the Bouldercombe Battery Project total capital spending budget was $60 million.

Reference
RENEW ECONOMY: Genex switches on its first big battery project on time and on budget (high confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MWh storage derived
$655,022

Shown in table
$655.0k (2026 real AUD)

Reported / source value
$600.0k (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived from reported total capital spending budget divided by 100 MWh.

Reference
RENEW ECONOMY: Genex switches on its first big battery project on time and on budget (high confidence)
Source recorded 05 Jun 2026

Fixed OPEX (annual)
$1.36M

Shown in table
$1.36M (2026 real AUD)

Reported / source value
$1.25M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated as 25,000 × 50 MW.

Fixed OPEX / MW-yr
$27,293

Shown in table
$27.3k (2026 real AUD)

Reported / source value
$25.0k (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific O&M source found in search; server-side default used.

Variable OPEX / MWh
$1.64

Shown in table
$1.64 (2026 real AUD)

Reported / source value
$1.50 (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M source found in search; server-side default used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026

Notes
Greenfield capex based on Genex-reported total capital spending budget of $60 million including finance costs and contingency funds for the 50MW/100MWh project. Fixed OPEX uses the provided server-side default for battery storage; variable OPEX uses the provided default. Project was fully operational from 2H CY2023.

Sources