BESS · South Australian Water Corporation · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 17:30 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-09-06 | 1.0004 |
| 2025-07-01 | 0.9999 |
| Capex total (greenfield) |
$1.30M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$257,853
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$81.2k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capital cost for the Bolivar battery (BOWWBA1) was found in official owner/government sources or reliable project announcements. The available SA Water and government materials located in search relate to Bolivar wastewater treatment upgrades, SA Water's broader renewable energy program, and an on-site battery storage mention at Bolivar, but not a project-specific capex figure for this battery unit. Internal technology defaults were therefore retained for non-capex operating assumptions only.