Blackwater Hybrid System

BESS · Blackwater Project Nominees Pty Ltd as trustee for the Blackwater Project Trust · Storage - Battery

Development AEMO: Publicly Announced Solar - Solar NEM data · 582h
200/400 MW
Researched capacity / storage
Est. SRMC
$0.20/MWh
Key information
Capacity (AI)
200 MW / 400 MWh

AEMO spreadsheet (provided project data); no alternative primary-source capacity figure was available in the supplied web results.

AEMO status Publicly Announced
Project status Development (AI)

AEMO spreadsheet status is Publicly Announced; no primary-source evidence of construction or commissioning found in provided results.

Coordinates —

DUID —
Owner Blackwater Project Nominees Pty Ltd as trustee for the Blackwater Project Trust
Commissioned Jun 2029
Expected closure —
Closure date —
Technology Storage - Battery
Fuel Solar - Solar
Module OEM unknown
Module / inverter supplier unknown
Inverter OEM —
Inverter model —
Equipment confidence low
Stats window
01 Sep 2026 00:00 → 25 Sep 2026 06:15 AEST

Dispatch & revenue

01 Sep 2026 00:00 → 25 Sep 2026 06:15 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
200 MW / 400 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.20/MWh
Capex total (greenfield)
$232.06M

Shown in table
$232.06M (2026 real AUD)

Reported / source value
$219.99M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
—
Capex / MW derived
$1,160,338

Shown in table
$1.16M (2026 real AUD)

Reported / source value
$1.10M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$18,000

Shown in table
$18.0k (2026 real AUD)

Variable OPEX / MWh default
$0.20

Shown in table
$0.20 (2026 real AUD)

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
I could not locate a reliable plant-specific greenfield capital cost announcement for the Blackwater Hybrid System from the owner/developer or government sources. Search results returned only unrelated Blackwater mine/project documents and a registry listing confirming the asset identity and operating date. Because no defensible project-specific capex was found, I have left capex fields null rather than substituting a benchmark. The generator appears to be registered as a solar PV hybrid asset with full commercial use date 2029-06-01 in the registry source, but no financial disclosures were identified.

Sources