Bellambi Heights Renewables Project

BESS · Vena Energy · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.50/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Vena Energy project announcement/publicly announced status for Bellambi Heights Renewables Project (company/project materials; no evidence of construction or commissioning located).

Coordinates

DUID
Owner Vena Energy
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Tesla
Battery platform / chemistry Megapack
Inverter OEM
Inverter / PCS model
Equipment confidence low
Stats window
21 Jul 2026 15:00 → 22 Jul 2026 15:00 AEST

Dispatch & revenue

21 Jul 2026 15:00 → 22 Jul 2026 15:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MWh storage
$358,607

Shown in table
$358.6k (2026 real AUD)

Reported / source value
$350.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield investment or total project cost announcement was found for Bellambi Heights BESS in the searched official owner and public sources. The project is a 408 MW battery energy storage system with approximately 2 hours of storage, located at Beryl, NSW, and construction was underway in Q1 2026. The owner page and public reporting confirm capacity and timing, but not total project capex. Because no project-specific capex was verified, capex fields are left null rather than using the AEMO/CSIRO benchmark. For fallback context only, AEMO/Aurecon 2024 cost review gives a 200 MW BESS with dedicated grid connection total EPC cost of $313.3M for 4-hour storage and $519.7M for 8-hour storage, but this was not applied as reported project capex.

Sources