Barron Gorge (BARRON-2)

Hydro · CleanCo Queensland Limited · Hydro - Run of River

Operational AEMO: In Service QLD1 Hydro - Water NEM data · 1h
35 MW
Registered nameplate capacity
1h revenue
$685
Capacity factor
26.8%
Revenue / MWh
$73.08
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
35 MW

AEMO status In Service
Project status Operational (AI)

CleanCo Queensland Barron Gorge asset page (2024) describes the 66MW power station as part of its owned and operated fleet; GEO lists the plant as operating and commissioned in 1963.

Region QLD1
Coordinates -16.85086, 145.64690 (AI)

Global Energy Observatory Barron Gorge Hydroelectric Power Station entry lists coordinates at -16.85086, 145.6469.

MLF 0.9569
DUID BARRON-2
Owner CleanCo Queensland Limited
Commissioned
Expected closure 2063
Closure date
Technology Hydro - Run of River
Fuel Hydro - Water
Turbine OEM Tamar Hydro
Turbine type / model Francis turbine
Equipment confidence low
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 01:10 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 01:10 AEST

Energy revenue (× MLF)
$685
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
9.4 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9569
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9556
2025-07-01 0.9569

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
35 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$4.11M

Shown in table
$4.11M (2026 real AUD)

Capex refurbishment
Capex / MW derived
$117,429

Shown in table
$117.4k (2026 real AUD)

Fixed OPEX (annual)
$1.26M

Shown in table
$1.26M (2026 real AUD)

Fixed OPEX / MW-yr
$36,000

Shown in table
$36.0k (2026 real AUD)

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
Entura recommends no separate VOM for hydropower; this supports setting variable opex to zero where FOM is used to capture O&M.

Reference
Pumped Hydro Cost Modelling (medium confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Barron Gorge is a 66 MW site with two 33 MW generators, while the supplied DUID BARRON-2 capacity is 35 MW. Site-level original construction cost is reported as £2.055 million expected cost for construction beginning 6 October 1960; it has been converted to A$4.11 million at the Australian decimal conversion rate of £1 = A$2 and divided by the current 66 MW site capacity for capex_per_mw. This is an old expected-construction figure from a secondary historical source and may not equal final outturn cost. A more useful modern capital datapoint is the reported A$28 million Stanwell refurbishment/upgrade program completed by 2011 that extended major component life by 40 years. Fixed O&M is not generator-specific: it is an estimate using Entura's AEMO hydropower O&M method, base A$16,000/MW/year in 2018 AUD, multiplied by 1.5 for station age over 50 years and 1.5 for station capacity under 100 MW, giving A$36,000/MW/year. Annual fixed opex applies that rate to the supplied 35 MW DUID capacity, not the 66 MW site. Variable O&M is set to zero because Entura recommends hydropower O&M be captured as fixed O&M rather than VOM. Heat rate and thermal efficiency are not applicable for non-combustion run-of-river hydro. No closure date was found; CleanCo is instead undertaking recovery, valve and PLC works following Cyclone Jasper impacts, with Kuranda Weir recovery works expected through the 2026 dry season.