Hydro · South Australian Water Corporation · Hydro - Run of River
14 Jun 2026 00:50 → 15 Jun 2026 00:50 AEST
| Capex total (greenfield) |
$2,904.46M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,904,458,599
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh default |
$1.00
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Plant-specific greenfield capital cost sourced from SA Water annual report and corroborated by project sources. The reported approved project cost was $1.824 billion nominal for the Adelaide Desalination Project/Plant; capacity here is 1 MW per provided NEM registration, so capex per MW is mathematically equal to total cost. No reliable plant-specific O&M benchmark was found in the searched sources for this unit; values left null rather than substituting generic hydro benchmarks.