Reece (REECE1)

Hydro · Hydro-Electric Corporation · Hydro - Dam

Operational AEMO: In Service TAS1 Hydro - Water NEM data · 30 days
116 MW
Registered nameplate capacity
30 days revenue
$3.36M
Capacity factor
46.2%
Revenue / MWh
$87.52
Est. SRMC
$1.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. TAS1 regional price (RRP) on right axis.

Key information
Capacity
116 MW

AEMO status In Service
Project status Operational (AI)

GlobalData Power Technology, 2021: Reece project described as currently active and entered commercial operation in 1986.

Region TAS1
Coordinates -41.72420, 145.13540 (AI)

Global Energy Observatory: Reece Hydroelectric Power Station coordinates -41.7242, 145.1354.

MLF 0.9203
DUID REECE1
Owner Hydro-Electric Corporation
Commissioned
Expected closure 2100
Closure date
Technology Hydro - Dam
Fuel Hydro - Water
Turbine OEM Fuji Electric
Turbine type / model Francis turbine
Equipment confidence high
Stats window
14 May 2026 19:55 → 13 Jun 2026 19:55 AEST

Dispatch & revenue

14 May 2026 19:55 → 13 Jun 2026 19:55 AEST

Energy revenue (× MLF)
$3.36M
FCAS revenue (× MLF)
$43.0k
FCAS volume
33,953.3 MWh
Dispatched
38,442.7 MWh
Available
61,100.0 MWh
Curtailed
22,842.6 MWh
Curtailment
37.4%
of available
MLF used
0.9203
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9212
2025-07-01 0.9203

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
116 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.00/MWh
Capex total (greenfield) default
$462.40M

Shown in table
$462.40M (2026 real AUD)

Capex refurbishment
Capex / MW default
$4,000,000

Shown in table
$4.00M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$1.00

Shown in table
$1.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown