BESS · Quorn Park Solar Farm Pty Ltd as the trustee for Quorn Park Solar Farm Trust · Storage - Battery
12 Jun 2026 17:10 → 13 Jun 2026 17:10 AEST
| Capex total (greenfield) |
$200.42M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$5,010,549
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$727.8k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Plant-specific project webpage states construction with an investment value of over $190 million and operational target in 2026. The project is a hybrid solar + BESS facility; however, the provided DUID capacity (27.6 MW / 40 MWh) does not match the public project page capacity (98 MW solar / 20 MW BESS) or the original NSW assessment report (80 MW solar / 20 MW / 20 MWh BESS). Capex is therefore treated as reported project-level investment, not a DUID-specific battery-only cost, and capex per MW is a rough allocation using the provided 27.6 MW capacity.