Coal · Origin Energy Eraring Pty Ltd · Turbine - Steam Sub Critical
Stats window 03 Jun 2026 14:55 → 04 Jun 2026 14:55 AEST
03 Jun 2026 14:55 → 04 Jun 2026 14:55 AEST
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
Estimated $ per interval using regional RRP and MLF effective on each day.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9855 |
| 2025-07-01 | 0.9854 |
| Capex total (greenfield) |
$2,581.97M
Source value How this was derived |
|---|---|
| Capex refurbishment |
—
How this was derived |
| Capex / MW |
$3,586,066
Source value |
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$41.77M
Source value |
| Fixed OPEX / MW-yr |
$58,017
Source value How this was derived |
| Variable OPEX / MWh |
$4.22
Source value How this was derived |
| Fuel cost / GJ |
$4.75
Source value |
| Heat rate GJ/MWh |
10.80
How this was derived Reference |
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
Web search returned AEMO heat-rate data for Eraring (existing generator) showing a static heat rate of 9.55 GJ/MWh, but not the required AEMO/CSIRO ETC capex benchmark for black coal sub-critical turbine, nor an AEMO/CSIRO fuel-cost parameter and refurbishment-cost data for ER04 specifically. Therefore capex and O&M/fuel/performance fields use the provided internal technology defaults (server-side). Commissioning/online date and any refurbishment/upgrades were not reliably sourced from official Origin/AEMO documents in the retrieved results.