Warning: session_start(): Session cannot be started after headers have already been sent in /home/nemstats/web/nemstats.com.au/public_html/lib/admin_auth.php on line 29

Callide Wind Farm

Wind · DP Green Energy Pty Limited · Wind Turbine - Onshore

Publicly Announced Wind - Wind NEM data · 24 hours
422 MW
Registered nameplate capacity
Est. SRMC
$0.53/MWh

Stats window 03 Jun 2026 15:40 → 04 Jun 2026 15:40 AEST

Key information
Capacity
422 MW
Status Publicly Announced
Lifecycle Pre-operating
DUID
Owner DP Green Energy Pty Limited
Commissioned
Expected closure 2060-07-02
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model

Dispatch & revenue

03 Jun 2026 15:40 → 04 Jun 2026 15:40 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
422 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
$527.43M

Source value
$500.00M (2024 nominal)

How this was derived
Official AIP project summary for Callide Wind Farm states capital expenditure is at least $500 million.

Reference
Australian Industry Participation Plan Summary - Project Phase (high confidence)

Capex refurbishment
Capex / MW
$1,251,011

Source value
$1.19M (2024 nominal)

How this was derived
Per-MW capex is a conservative minimum derived from the reported project capex floor and the registered capacity.

Reference
Australian Industry Participation Plan Summary - Project Phase (medium confidence)

Capex / MWh storage
Fixed OPEX (annual)
$24.46M

Source value
$23.19M (2024 nominal)

How this was derived
Annual fixed O&M was calculated from the fallback per-MW rate and the site capacity.

Fixed OPEX / MW-yr
$58,017

Source value
$55.0k (2024 nominal)

How this was derived
No plant-specific onshore wind fixed O&M figure was found in the official/owner sources searched, so the provided fallback was used.

Variable OPEX / MWh
$0.53

Source value
$0.50 (2024 nominal)

How this was derived
No plant-specific variable O&M figure was found in the official/owner sources searched, so the provided fallback was used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Plant-specific capital expenditure was not disclosed as an exact amount in the available source; the official AIP summary states 'Capital expenditure: $500 million or more'. I used $500 million as the minimum reported project capex for normalised costing, which is conservative and likely understates true total project investment. The project is described as a new facility with up to 70 wind turbines, a 275/33kV site substation, BESS, 275kV switchyard, export lines and ancillary infrastructure. Construction completion in the AIP summary is listed as 31 Dec 2026, but the project website now says construction is planned to commence in 2027, so the timing is somewhat inconsistent across sources.

Sources