Gas Peakers · CSE H2 Pty Ltd · Turbine - OCGT
04 Jun 2026 00:00 → 05 Jun 2026 00:00 AEST
| Capex total (greenfield) |
$1,024.59M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,561,475
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$18.44M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$46,107
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$2.56
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
$12.30
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
10.50
Shown in table How this was derived |
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026
Notes
Project-specific public sources found for the Brigalow Peaking Power Plant indicate a 400 MW natural-gas peaking station at the Kogan Creek site, with construction expected to complete in 2028. No authoritative plant-specific greenfield total capex figure was found in the provided search results; the only explicit project cost reference located was a Reuters-reported estimate of around A$1 billion, attributed to RBC Capital Markets rather than the owner/developer. The capex fields therefore use an estimated value aligned to that external estimate and should be reviewed if a formal owner announcement becomes available. No refurbishment-specific cost identified.