Bolivar Waste Water Treatment (BOLIVAR1)

Other Generators · South Australian Water Corporation · Reciprocating Engine - Spark ignition

AEMO: removed SA1 Renewable Biomass or Waste - Biogas NEM data · 24 hours
8 MW
Registered nameplate capacity
Est. SRMC
$57.00/MWh
Key information
Capacity
8 MW

AEMO status removed
Project status (AI)

Region SA1
DUID BOLIVAR1
Owner South Australian Water Corporation
Commissioned
Expected closure 2025-07-02
Closure date
Technology Reciprocating Engine - Spark ignition
Fuel Renewable Biomass or Waste - Biogas
Plant supplier
Boiler / turbine equipment
Stats window
03 Jun 2026 19:10 → 04 Jun 2026 19:10 AEST

Dispatch & revenue

03 Jun 2026 19:10 → 04 Jun 2026 19:10 AEST

No dispatch data for DUID BOLIVAR1 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Waste / landfill gas
Capacity
8 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$57.00/MWh
Capex total (greenfield) default
$18.75M

Shown in table
$18.75M (2026 real AUD)

Capex refurbishment
Capex / MW default
$2,500,000

Shown in table
$2.50M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$50,000

Shown in table
$50.0k (2026 real AUD)

Variable OPEX / MWh default
$3.00

Shown in table
$3.00 (2026 real AUD)

Fuel cost / GJ default
$6.00

Shown in table
$6.00 (2026 real AUD)

Heat rate GJ/MWh default
9.00

Shown in table
$9.00 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown