Bolivar Power Station (BOLIVPS1)

Gas Peakers · Iberdrola Australia Energy Markets Pty Limited · Turbine - OCGT

Operational AEMO: In Service SA1 Fossil - Natural Gas Pipeline NEM data · 24 hours
128 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
$26.95
Est. SRMC
$128.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
128 MW

AEMO status In Service
Project status Operational (AI)

Region SA1
MLF 1.0000
DUID BOLIVPS1
Owner Iberdrola Australia Energy Markets Pty Limited
Commissioned Dec 2022
Expected closure 2025-07-02
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM
Turbine / engine model
Stats window
04 Jun 2026 01:40 → 05 Jun 2026 01:40 AEST

Dispatch & revenue

04 Jun 2026 01:40 → 05 Jun 2026 01:40 AEST

Revenue (× MLF)
$0
Dispatched
0.0 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
1.0000
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9996
2025-07-01 1.0000

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
128 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$128.50/MWh
Capex total (greenfield) default
$154.08M

Shown in table
$154.08M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,200,000

Shown in table
$1.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$45,000

Shown in table
$45.0k (2026 real AUD)

Variable OPEX / MWh default
$2.50

Shown in table
$2.50 (2026 real AUD)

Fuel cost / GJ default
$12.00

Shown in table
$12.00 (2026 real AUD)

Heat rate GJ/MWh default
10.50

Shown in table
$10.50 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown