Berrybank Wind Farm (BRYB1WF1)

Wind · Berrbank Development Pty ltd · Wind Turbine - Onshore

Operational AEMO: In Service VIC1 Wind - Wind NEM data · 24 hours
181 MW
Registered nameplate capacity
24 hours revenue
$38.6k
Capacity factor
51.6%
Revenue / MWh
$17.26
Est. SRMC
$0.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
181 MW

AEMO status In Service
Project status Operational (AI)

Region VIC1
MLF 0.9465
DUID BRYB1WF1
Owner Berrbank Development Pty ltd
Commissioned Apr 2021
Expected closure 2025-07-02
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
03 Jun 2026 21:00 → 04 Jun 2026 21:00 AEST

Dispatch & revenue

03 Jun 2026 21:00 → 04 Jun 2026 21:00 AEST

Revenue (× MLF)
$38.6k
Dispatched
2,235.0 MWh
Available
1,252.9 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9465
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9315
2025-07-01 0.9465

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
181 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield) default
$397.32M

Shown in table
$397.32M (2026 real AUD)

Capex refurbishment
Capex / MW default
$2,200,000

Shown in table
$2.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$0.50

Shown in table
$0.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: ai estimated · Capex basis: unknown · AI checked 04 Jun 2026

Notes
No web search results were returned for this specific generator, so no generator-specific financial values could be source-backed. Wind turbines have no fuel cost and no heat rate in the conventional thermal sense; emissions intensity is operationally zero at point of generation. Asset life is a technology-default estimate for onshore wind only, not a sourced Berrybank-specific value.

Sources

  • asset_life_years (low)
  • emissions_intensity_tco2_mwh (low)