Bell Bay Three (BBTHREE1)

Gas Peakers · AETV Pty Ltd · Turbine - OCGT

Operational AEMO: In Service TAS1 Fossil - Natural Gas Pipeline NEM data · 24 hours
40 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$182.63/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. TAS1 regional price (RRP) on right axis.

Key information
Capacity
40 MW
AEMO status In Service
Project status Operational (AI)

Region TAS1
MLF 0.9986
DUID BBTHREE1
Owner AETV Pty Ltd
Commissioned
Expected closure 2025-07-02
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM
Turbine / engine model
Stats window
03 Jun 2026 17:40 → 04 Jun 2026 17:40 AEST

Dispatch & revenue

03 Jun 2026 17:40 → 04 Jun 2026 17:40 AEST

Revenue (× MLF)
$0
Dispatched
MWh
Available
260.4 MWh
Curtailed
260.4 MWh
Curtailment
100.0%
of available
MLF used
0.9986
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9977
2025-07-01 0.9986

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
40 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$182.63/MWh
Capex total (greenfield)
$16.67M

Shown in table
$16.67M (2026 real AUD)

How this was derived
Hydro Tasmania reported the Bell Bay Three project cost as $50 million for three units. For this single DUID, a one-third allocation is used.

Reference
Hydro Tasmania Annual Report 2006 (high confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW
$416,667

Shown in table
$416.7k (2026 real AUD)

How this was derived
Derived unit capex uses the reported total project cost and the current 40 MW DUID capacity; the source does not report a BBTHREE1-only cost.

Reference
Hydro Tasmania Annual Report 2005-06 (medium confidence)
Source recorded 04 Jun 2026

Capex / MWh storage
Fixed OPEX (annual)
$520.0k

Shown in table
$520.0k (2026 real AUD)

How this was derived
Calculated annual FOM for BBTHREE1 only; not a reported plant budget.

Reference
Fuel resource, new entry and generation costs in the NEM (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$13,000

Shown in table
$13.0k (2026 real AUD)

How this was derived
Provides a Bell Bay Three-specific fixed O&M assumption for 2009-10. Annual fixed opex for BBTHREE1 is calculated as 40 MW x $13,000/MW-year.

Reference
Fuel resource, new entry and generation costs in the NEM (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$7.93

Shown in table
$7.93 (2026 real AUD)

How this was derived
Bell Bay Three-specific VOM assumption from a market modelling cost review; value is old nominal 2009-10 AUD.

Reference
Fuel resource, new entry and generation costs in the NEM (medium confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
$14.51

Shown in table
$14.51 (2026 real AUD)

How this was derived
Used only as a market proxy because no Bell Bay Three-specific delivered gas price was found.

Reference
East coast gas supply outlook worsens July to September 2025, but forward longer-term prices ease (low confidence)
Source recorded 04 Jun 2026

Heat rate GJ/MWh
12.04

Shown in table
$12.04 (2026 real AUD)

How this was derived
AEMO heat-rate data provides the preferred heat-rate assumption for existing Bell Bay Three units.

Reference
AEMO heat rate data (high confidence)
Source recorded 04 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026

Notes
Specific financial details for Bell Bay Three are not available in public domain or recent reports.

Latest AI note (4 Jun 2026)

Bell Bay Three consists of three 40 MW Pratt & Whitney FT8 Twin Pac OCGT units. The reported 2006 capex was $50 million for the three-unit Bell Bay Three project, including purchase/installation of gas turbines and associated transmission upgrades; the value entered for BBTHREE1 is a one-third pro-rata allocation and is therefore marked estimated. O&M and heat-rate assumptions are from public modelling sources for Bell Bay Three/OCGT and are not confirmed as current owner budget values. Emissions intensity is taken from an older ACIL Tasman total CO2-e intensity for Bell Bay Three including fugitive emissions; using current NGA 2025 direct-combustion factor only and AEMO static heat rate would imply about 0.62 tCO2-e/MWh generated. Closure information is conflicting/uncertain: Nemstats reports expected closure 2025-07-02, while AEMO 2025-26 MLF documents still list BBTHREE1 as a Tasmanian generator for FY2025-26.

View 4 earlier AI notes
4 Jun 2026

Bell Bay Three comprises three small aero-derivative OCGT units originally acquired from the United States and installed in 2005-06; the reported project cost was AUD 50 million for all three 38.75 MVA units including installation and associated transmission upgrades. The capex_total_aud shown here is a pro-rata single-DUID allocation for BBTHREE1, not a separately reported unit-level contract price. O&M, heat rate, efficiency, emissions intensity and asset life are technology-default estimates for small OCGT/small gas turbines from AEMO/Aurecon 2024 assumptions, not Bell Bay Three-specific operating data. Emissions intensity is derived as 10.489 GJ/MWh HHV heat rate multiplied by the Australian NGA 2025 pipeline natural gas Scope 1 factor of 51.53 kg CO2-e/GJ. AEMO/Nemstats lists BBTHREE1 as 40 MW and in service with an expected closure date of 2025-07-02, but the Tasmanian Economic Regulator 2024-25 review states the Tamar Valley OCGT units remain available at all times; treat closure status as needing review against the latest AEMO April 2026 generation-information workbook.

4 Jun 2026

Bell Bay Three comprises three Pratt & Whitney FT8 Twin Pac OCGT units now reported within Tamar Valley Power Station's OCGT fleet. Hydro Tasmania reported AUD 50 million for acquisition and installation of three 35 MW gas turbines in FY2005/06; the capex_total_aud shown here is an allocated one-third estimate for DUID BBTHREE1, while capex_per_mw_aud preserves the reported package cost divided by the reported 105 MW scope. Hydro Tasmania now describes the three units as 3 x 40 MW; AEMO/Hydro historical sources describe the original scope as 3 x 35 MW / 105 MW. Fixed O&M, variable O&M, heat rate, efficiency and life are technology-default assumptions from Aurecon/AEMO 2024 small OCGT parameters because BBTHREE1-specific cost/performance values were not found. Emissions intensity is calculated from the default HHV heat rate at maximum operation of 10.489 GJ/MWh multiplied by the 2025 Australian NGA natural-gas stationary-combustion factor of 51.53 kg CO2-e/GJ. Closure/refurbishment notes: the FT8 fleet remains used as-needed; AETV reported Unit 103B was taken offline during 2017/18 and remains permanently in long-term in situ storage, and reported ongoing NOx issues and minimal near-term FT8 operation after a 2023 stack-testing non-compliance. This affects the Bell Bay Three fleet but not necessarily BBTHREE1 alone.

4 Jun 2026

BBTHREE1 is one of the three Bell Bay Three / Tamar Valley FT8 OCGT units. Original project capex was reported for all three 38.75 MVA gas turbine units, not individually by DUID; the capex_total_aud and capex_per_mw_aud above allocate the reported $52.409m project cost equally across three 40 MW NEM units. Fixed and variable O&M are not generator-specific public values; defaults use Aurecon/AEMO 2024 small aero-derivative OCGT assumptions excluding fuel. AEMO provides a generator-specific static heat rate for Bell Bay Three of 12.04 GJ/MWh HHV. Emissions intensity is calculated as 12.04 GJ/MWh x 51.53 kg CO2-e/GJ for pipeline natural gas. Hydro material from 2016 says the FT8 units were second-hand when purchased and were then approaching end of life; however, Hydro’s current station page and 2023-24 AER show the FT8s remain part of the operating TVPS fleet, with Unit 103B in long-term in-situ storage. For BBTHREE1/Unit 101, 2023-24 AER notes FT8 NOx issues, management of FT8 operating hours, and expectation of minimal near-term FT8 operation after a November 2023 stack-testing non-compliance.

4 Jun 2026

BBTHREE1 is one of the three 40 MW Pratt & Whitney FT8 Twin Pac OCGT units at Tamar Valley/Bell Bay Three. Generator-specific construction cost, fixed O&M, VOM, and current fuel prices were not publicly found. Capex is estimated by allocating the reported A$75m 2007 acquisition of the 105 MW Bell Bay peaking station/assets across three units; scope likely included site/assets and gas pipeline capacity agreements, not a greenfield construction EPC cost. Fixed O&M and VOM use AEMO/Aurecon 2024 small aero-derivative OCGT defaults, excluding fuel. Heat rate and efficiency use Mitsubishi Power published FT8 SWIFTPAC 60 50 Hz package values as a proxy for FT8 Twin Pac. Emissions intensity uses a public AEMO-attributed generator emissions factor dataset; ACIL Allen/AEMO emissions review confirms Bell Bay Three as a gas OCGT in the emissions factor set but the exact numeric value was not machine-readable from the PDF figures. Closure data is conflicting/stale: nemstats/AEMO-derived data lists BBTHREE1 in service with an expected closure date of 2025-07-02, while AEMO 2025-26 MLF tables still list BBTHREE1.