Wind · BWF Nominees Pty Ltd as trustee for the BWF Trust · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
03 Jun 2026 18:10 → 04 Jun 2026 18:10 AEST
Estimated $ per interval using regional RRP and MLF effective on each day.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9182 |
| 2025-07-01 | 0.9355 |
| Capex total (greenfield) |
$173.77M
Shown in table How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,049,180
Shown in table How this was derived Reference |
| Fixed OPEX (annual) |
$2.12M
Shown in table How this was derived Reference |
| Fixed OPEX / MW-yr |
$25,000
Shown in table How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table How this was derived Reference |
| Fuel cost / GJ |
$0.00
Shown in table How this was derived Reference |
| Heat rate GJ/MWh |
—
How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026
Notes
BANGOWF2-specific construction cost was not found. Reported project capex is AUD 500 million total project value for the whole 244 MW Bango Wind Farm in 2019. The capex_total_aud shown here is a pro-rata allocation to BANGOWF2 using 84.8 MW / 244 MW, preserving the original nominal 2019 reported project cost. Fixed and variable opex are technology-default assumptions from CSIRO/AEMO GenCost 2023-24, not site-reported values. Wind heat rate and thermal efficiency are not applicable. Owner page states turbine design life at least 30 years; the 2022 Environmental Management Strategy also says the wind farm operational phase is expected to have a duration of 25 years, with decommissioning or upgrades possible.
Bango Wind Farm is a 244 MW, 46-turbine onshore wind project. Public capex sources report only whole-project value, not DUID-specific BANGOWF2 value. Therefore capex_total_aud is estimated by pro-rating reported AUD 500m whole-project value by BANGOWF2 capacity of 84.8 MW over reported 244 MW total capacity. Whole-site nominal capex is preserved in the sources array. Fixed O&M, variable O&M, fuel cost and efficiency are technology default assumptions from CSIRO GenCost 2023-24 because generator-specific O&M contracts or costs were not found. Asset-life sources conflict: project EMS says operational phase expected duration 25 years, while the current Squadron project page states turbine design life at least 30 years; financial profile uses 25 years consistent with EMS and GenCost LCOE assumptions. No public major refurbishment has been found as of this research; decommissioning/repowering is expected at end of useful life.