Wind · BWF Nominees Pty Ltd as trustee for the BWF Trust · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
03 Jun 2026 20:55 → 04 Jun 2026 20:55 AEST
Estimated $ per interval using regional RRP and MLF effective on each day.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9047 |
| 2025-07-01 | 0.9226 |
| Capex total (greenfield) |
$325.82M
Shown in table How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,049,180
Shown in table How this was derived Reference |
| Fixed OPEX (annual) |
$3.98M
Shown in table How this was derived Reference |
| Fixed OPEX / MW-yr |
$25,000
Shown in table How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table How this was derived Reference |
| Fuel cost / GJ |
—
How this was derived Reference |
| Heat rate GJ/MWh |
—
How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026
Notes
The only specific capex found was for the overall Bango Wind Farm project: AUD 500 million total project value for a 244 MW construction-ready project. Because BANGOWF1 is the 159 MW Bango 973 feeder within the full Bango project, capex_total_aud has been pro-rated as 159/244 of AUD 500 million. Fixed and variable O&M are not disclosed for Bango; the values use the AEMO/Aurecon 2024 onshore wind benchmark of AUD 28,000/MW-year and variable O&M included in fixed O&M. The planning Environmental Management Strategy states a 25-year operational phase, while the current Squadron project page says wind turbine design life will be at least 30 years; use 25 years for conservative financial/economic modelling and note possible repowering/life extension. No major refurbishment is reported as completed; decommissioning or upgrades/repowering are expected at end of operational life.
BANGOWF1 is the larger DUID within the 244 MW Bango Wind Farm project. The only located capex figure is a reported project-level value of A$500 million for the 244 MW Bango Wind Farm at financial close in 2019; capex_total_aud is prorated to BANGOWF1 using 159 MW / 244 MW. Fixed and variable O&M are not project-specific; they use CSIRO GenCost 2023-24 onshore wind defaults of A$25/kW-year fixed O&M and A$0/MWh variable O&M. Asset life has conflicting project sources: the 2022 Environmental Management Strategy states an expected 25-year operational phase, while the current Squadron project page says turbine design life is at least 30 years and then repower or decommission. No major refurbishment has been found; closure/decommissioning is expected at end of useful life unless repowered.