Solar · South Australian Water Corporation · Solar PV - Fixed
Stats window 03 Jun 2026 16:05 → 04 Jun 2026 16:05 AEST
03 Jun 2026 16:05 → 04 Jun 2026 16:05 AEST
| Capex total (greenfield) |
$300.0k
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$15,000,000
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$5.0k
|
| Fixed OPEX / MW-yr |
$250,000
|
| Variable OPEX / MWh |
$0.00
|
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 02 Jun 2026
Notes
The fixed O&M costs are estimated based on industry standards for solar PV technology.