BESS · Hazelwood BESS Project Co Pty Ltd as trustee for the HBESS Asset Trust · Storage - Battery
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
03 Jun 2026 22:30 → 04 Jun 2026 22:30 AEST
Estimated $ per interval using regional RRP and MLF effective on each day.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).| Effective from | MLF |
|---|---|
| 2024-08-15 | 0.9864 |
| 2025-07-01 | 0.9873 |
| Capex total (greenfield) |
$186.57M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$1,151,649
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$6.22M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$31,095
Shown in table Reported / source value |
| Variable OPEX / MWh |
$1.87
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Owner/developer press material indicates the Hazelwood BESS was jointly funded and developed by ENGIE and Eku Energy; a contemporaneous industry report cited an estimated project cost of $150 million at construction start in December 2021. The project was commissioned on 14 June 2023 and is described by ENGIE as having an expected lifespan of 20 years. No separate refurbishment capex was identified.