Owner: Water NSW
Status:
Technology Type: Storage - Pumped hydro
Fuel Type: Hydro - Water
DUID:
Capacity: 0 MW
Full Commercial Use Date:
Expected Closure Year:
Closure Date:
29 May 2026 04:00 → 30 May 2026 04:00 AEST · data through 30 May 2026, 04:00
| Capex total | — |
|---|---|
| Capex / MW default | $3,500,000 |
| Capex / MWh storage default | $200,000 |
| Fixed OPEX (annual) | — |
| Fixed OPEX / MW-yr default | $45,000 |
| Variable OPEX / MWh default | $1.20 |
| Fuel cost / GJ | — |
| Heat rate GJ/MWh | — |
Confidence: unknown · Status: needs review · Capex basis: unknown