BESS · Global Power Generation Australia Pty Ltd · Storage - Battery
Stats window 03 Jun 2026 14:35 → 04 Jun 2026 14:35 AEST
03 Jun 2026 14:35 → 04 Jun 2026 14:35 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW default |
$400,000
|
| Capex / MWh storage default |
$350,000
|
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
|
| Variable OPEX / MWh default |
$1.50
|
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: unknown · Status: ai estimated · Capex basis: unknown · AI checked 04 Jun 2026
Notes
No source-backed web results were returned for this specific generator, so no generator-specific financial or operating assumptions could be verified. Battery storage has no direct fuel cost or heat rate; emissions intensity operationally assumed to be zero at point of generation, but this was not source-verified for this site.