Bennetts Creek BESS

BESS · Aries Energy Project Pty Ltd in its capacity as Trustee for the Aries Energy Project Trust · Storage - Battery

Publicly Announced Other - Other NEM data · 24 hours
100/200 MW
Registered nameplate capacity / storage
Est. SRMC
$1.50/MWh

Stats window 03 Jun 2026 16:00 → 04 Jun 2026 16:00 AEST

Key information
Capacity
100 MW / 200 MWh
Status Publicly Announced
Lifecycle Pre-operating
DUID
Owner Aries Energy Project Pty Ltd in its capacity as Trustee for the Aries Energy Project Trust
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model

Dispatch & revenue

03 Jun 2026 16:00 → 04 Jun 2026 16:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
100 MW / 200 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
$150.00M

How this was derived
Third-party project reporting identifies Bennetts Creek as a $150m Gippsland battery project. Used as the generator-specific capex value because official financing disclosures did not state a value.

Reference
Funding secured and two major contracts signed for $150m Gippsland battery project, with construction to commence this year (medium confidence)

Capex refurbishment
Capex / MW
$1,500,000
Capex / MWh storage
$750,000
Fixed OPEX (annual)
$1.33M

How this was derived
Aurecon's 200 MW 2-hour BESS O&M with warranty is AUD 2.66m/year; scaled linearly to 100 MW gives AUD 1.33m/year.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)

Fixed OPEX / MW-yr
$13,300

How this was derived
Default O&M assumption for a 2-hour large-scale BESS. Scaled to Bennetts Creek's 100 MW as AUD 1.33m/year.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)

Variable OPEX / MWh default
$1.50

How this was derived
Variable O&M is not modelled as a separate reported cost for BESS in the Aurecon technology review, so the field is left null rather than assuming a numeric value.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)

Fuel cost / GJ
Heat rate GJ/MWh

How this was derived
Aurecon treats batteries using charge/discharge efficiency parameters rather than heat-rate parameters.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
No web search results were returned for this specific generator, so no generator-specific financial or operating assumptions could be source-verified. For a battery storage asset, fuel cost, heat rate, and direct emissions intensity are generally not applicable; emissions intensity is set to 0 only as a technology default, not as a site-specific reported value. Major refurbishment or closure notes unavailable.

Latest AI note (4 Jun 2026)

Specific official capex and O&M figures were not found in Flow Power, Zenviron or Monadelphous disclosures. Capex uses a third-party Projectory report describing the project as a $150m Gippsland battery project; official Flow Power/Zenviron sources confirm financial close, scope, contractor roles and construction/commercial-operation timing but not the dollar value. Capex per MWh is calculated against the user-provided 200 MWh storage capacity; the latest official financial-close and contractor sources also state 100 MW / 223 MWh, which would imply about AUD 672,646/MWh. O&M, round-trip efficiency and asset life are technology default estimates from Aurecon's 2024 Energy Technology Cost and Technical Parameter Review for a 2-hour large-scale lithium-ion BESS, scaled to 100 MW. Fixed opex includes Aurecon's 2-hour BESS fixed O&M of AUD 8,000/MW-year plus indicative 20-year extended warranty of AUD 5,300/MW-year. Variable O&M is left null because Aurecon states BESS long-term service agreements are not typically based on fixed/variable splits. Direct operational emissions are treated as zero for battery storage; lifecycle and charging-energy emissions are market-dependent and not included. Closure/refurbishment: Aurecon indicates 20-year economic/design life, possible extension to about 25 years after condition assessment, and further life extension with battery upgrades; no Bennetts Creek-specific closure date was found. Current project timeline: planning permit Q4 2023, GPS approval Q1 2024, financial close Q4 2025, construction commences Q1 2026, commercial operation expected 2028.

Sources