Owner: ACEN Australia Pty Ltd
Status:
Technology Type: Wind Turbine - Onshore
Fuel Type: Wind - Wind
DUID:
Capacity: 0 MW
Full Commercial Use Date:
Expected Closure Year:
Closure Date:
29 May 2026 04:00 → 30 May 2026 04:00 AEST · data through 30 May 2026, 04:00
| Capex total | $649.60M |
|---|---|
| Capex / MW | $3,248,000 |
| Capex / MWh storage | — |
| Fixed OPEX (annual) | $5.80M |
| Fixed OPEX / MW-yr | $29,000 |
| Variable OPEX / MWh | $0.00 |
| Fuel cost / GJ | — |
| Heat rate GJ/MWh | — |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 02 Jun 2026
Notes: Aquila Wind appears to be a proposed asset, not an operating registered NEM generator; no DUID was found. Official ACEN/NSW sources describe Aquila Wind as under assessment / Prepare EIS, with up to 48 turbines and up to 300 MW, while the user-supplied generator record states 200 MW. Financial values above are therefore not reported Aquila project costs: they are default 2025-26 Australian onshore-wind assumptions scaled to 200 MW. If scaled to ACEN/ANZIP's current up-to-300 MW project scope, the same default capex would imply AUD 974.4 million excluding the separately described 100 MW / 200 MWh battery. No generator-specific fixed O&M, variable O&M, refurbishment budget or closure date was found. Closure/decommissioning is represented only by ACEN's stated commitment to decommission project infrastructure at end of project life.